Skip to main content

San Anselmo Flood Risk Reduction Project

Summary

Project Description

Description

The Project includes modifications to the Building Bridge #2 (BB2) portion of the San Anselmo Flood Risk Reduction project and includes replacing an existing retaining wall along San Anselmo Avenue, adding abutments for a future pedestrian bridge, and possibly adding a temporary baffle.

Review type

Addendums

Status

Active

Location

Location

Assessor's Parcel Number (APN): 006-102-28
Address: 634-636 San Anselmo Ave., San Anselmo

Other Project Contact

Hugh Davis , Civil Engineer, Marin County Department of Public Works, 415-473-4232

Notice of Availability

Notice of Availability

NOTICE IS HEREBY GIVEN that the public review period for the San Anselmo Flood Risk Reduction EIR Second Addendum (BB2) began on Friday, November 3, 2023 and ended on Monday, December 11, 2023 at 4:00 p.m. 

The topical areas addressed in the EIR Addendum included:

  1. Aesthetics
  2. Agricultural and Forestry Resources
  3. Air Quality
  4. Biological Resources
  5. Cultural Resources
  6. Energy
  7. Geology and Soils
  8. Greenhouse Gas Emissions
  9. Hazards and Hazardous Materials
  10. Hydrology and Water Quality
  11. Land Use and Planning
  12. Mandatory Findings of Significance
  13. Mineral Resources
  14. Noise
  15. Population and Housing
  16. Public Services
  17. Recreation
  18. Transportation
  19. Tribal Cultural Resources
  20. Utilities and Service Systems
  21. Wildfire

If you challenge the decision on this proposed project in court, you may be limited to raising only those issues you or someone else raised at the public hearing, or in written correspondence delivered to the Community Development Agency, Planning Division during or prior to the public hearing. (Government Code Section 65009(b)(2)).

Environmental Review Materials

Environmental Review Materials DELETE

Public Notice

View Public Notice - Revised Notice of Availability

2023 EIR Second Addendum (BB2)

The documents in this list may not work with all assistive technology and are being remediated. For alternative formats, please email Tammy Taylor or phone 415-473-6269. To use the California relay service, dial 711.

  • SAFRR BB2 - Draft 2nd EIR Addendum (22.01 MB) — The draft of the second addendum for the 2018 Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project (Building Bridge #2).

2023 EIR First Addendum

The documents in this list may not work with all assistive technology and are being remediated. For alternative formats, please email Tammy Taylor or phone 415-473-6269. To use the California relay service, dial 711.

  • SAFRR - Draft 1st EIR Addendum (3.35 MB) — The draft of the first addendum for the 2018 Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project.
  • SAFRR - 1st EIR Addendum Response to Comments (8.15 MB) — The Response to Comments document prepared after the public comment period for the draft first addendum for the 2018 Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project.

2018 EIR

The documents in this list may not work with all assistive technology and are being remediated. For alternative formats, please email Tammy Taylor or phone 415-473-6269. To use the California relay service, dial 711.

  • SAFRR - Draft EIR (47.97 MB) — The draft of the Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project.
  • SAFRR - Final EIR Volume 1, Part 1 (25.05 MB) — The final Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project, Volume 1, Part 1.
  • SAFRR - Final EIR Volume 1, Part 2 (32.55 MB) — The final Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project, Volume 1, Part 2.
  • SAFRR BB2 - Final EIR Volume 2 (44.80 MB) — The final Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project, Volume 2.
  • SAFRR - Notice of Hearing for Final EIR (0.06 MB) — The public notice for the Marin County Board of Supervisors hearing to approve the final Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project.

Related

Page updated June 12, 2024